Capacity 5,500 m³ per hour. Used for reclamation, channelisation, and port maintenance projects.
Capacity 5,500 m³ per hour. Used for reclamation, channelisation, and port maintenance projects.
Capacity 5,500 m³ per hour. With a cutter head for precise excavation, this dredger is well-suited for reclamation, channelisation, and port maintenance.
| Year of Build | 1969 |
| Year of Rebuild | 2014 |
| Shipyard | Van Rees - IHC |
| Total Weight | 615 ton |
| Overall Length (LOA) | 61.85 m |
| Beam | 9.93 m |
| Height Above Water | 9.00 m |
| Hull Depth | 2.30 m |
| Draught | 1.56 m |
| Cutter Depth | 14 m |
| Suction Depth | 22.00 - 32.00 m |
| Suction Pipe Diameter | 650 mm / 26" |
| Discharge Pipe Diameter | 600 mm / 24" |
| Pump Engines | 2 x Caterpillar D398 B 1700 HP |
| Main Generator | 1 x Caterpillar D398 B 850 HP |
| Hydraulic Generator | John Deere 150 kVA |
| Harbour Generator | John Deere 100 kVA |
| Fresh Water Capacity | 5,500 Ltr |
| Fuel Capacity | 30,000 Ltr |
| Total Mixture Capacity | 4,500 m³/hr |
| Estimated Sand Capacity | 700 m³/hr |
| Discharge Distance | 1,500 - 2,500 m (Depending on the size of sand) |
| Spud Diameter | 700 mm / 28" |
| Spud Length | 21.00 m |
| Spud Carrier | 4.50 m |